Case studies

Manufacturing: Automotive, Plastics & Rubber case studies

Monitor compressed air, electrical demand and equipment condition—including the older assets your existing systems may not cover.

7 of our 19 case studies are in this sector.

All 19 case studies What we meter in Manufacturing: Automotive, Plastics & Rubber

A real page with its own address (§B.2), reachable from the Industries hub, the sector page and the library’s industry rail.

What we found in factories like these.

  • WaterManufacturing: Automotive, Plastics & Rubber

    Chiller circuit leak isolated without a shutdown

    An automotive factory

    Continuous monitoring helped identify and isolate a leaking cooling loop while the production line remained in operation.

    1 loopisolated

  • Compressed airManufacturing: Automotive, Plastics & RubberMetal Fabrication & Finishing

    Compressed air leaks in a stamping operation

    A Tier 2 automotive stamping factory

    Permanent monitoring revealed compressed air continuing to flow into an otherwise idle building overnight.

    20–30%of compressor output

  • Predictive maintenanceBulk Handling & Rail LogisticsManufacturing: Automotive, Plastics & Rubber

    Conveyor-drive bearing degradation detected six weeks before failure

    A bulk handling facility

    The bearing’s vibration signature began changing approximately six weeks before the projected failure point.

    6 weeksof warning

  • Cooling towersWaterManufacturing: Automotive, Plastics & RubberBuilding Materials, Concrete & Aggregates

    Cooling tower blowdown optimization

    A plastics manufacturing factory

    Blowdown was controlled by a timer rather than conductivity, causing usable water to be discharged unnecessarily.

    1 setpointchanged

  • Natural gasBuilding Materials, Concrete & AggregatesManufacturing: Automotive, Plastics & Rubber

    A 1970s boiler brought onto the dashboard

    A heavy manufacturing factory

    A fifty-year-old boiler, integrated through its 4-20 mA output. Nothing was ripped out.

    4-20 mAintegration

  • Energy & electricityManufacturing: Automotive, Plastics & Rubber

    Three factories, one unit of production, one outlier

    A manufacturer with three factories

    Same product, same equipment, and one factory used about 40% more energy per unit.

    ~40%more energy per unit

  • Temperature & humidityMetal Fabrication & FinishingManufacturing: Automotive, Plastics & Rubber

    Welding bay CO and CO₂ monitoring

    A metal fabrication shop

    Air quality in the welding bay, watched continuously instead of checked quarterly.

    Continuousvs. quarterly

See what these numbers look like in your factory.

Bring us a shift and a stack of bills. We will walk the floor with your team, point at what is worth metering first, and put a figure beside it.

Book a site visitRun the numbers

or call 1-833-QUANTFY (1-833-782-6839)