Case studies

What the data revealed — and what changed next.

Explore monitoring projects from Canadian facilities across manufacturing, food and beverage, agriculture, logistics and public utilities.

  • Predictive maintenanceWaterBreweries & Beverage

    A failing diaphragm pump, caught before it failed

    Carlsberg Canada

    A failing diaphragm pump caught before it failed, and 540,000 L/day of loss prevented.

    540,000 Lper day

  • WaterBreweries & BeverageFood & Beverage Processing

    Pasteurizer water use reduced from 28.0 to 5.5 m³/day

    Carlsberg Canada

    Pasteurizer water use fell from 28.0 to 5.5 m³/day, producing approximately $38,400 in annual savings through operational changes alone.

    $38,400per year

  • Compressed airWaterFood & Beverage ProcessingBulk Handling & Rail Logistics

    More than 450,000 litres saved in four months

    PDI Bulk

    PDI Bulk saved more than 450,000 litres of water in four months and produced a clear before-and-after view of compressor performance.

    >450,000 Lin 4 months

  • WaterManufacturing: Automotive, Plastics & Rubber

    Chiller circuit leak isolated without a shutdown

    An automotive factory

    Continuous monitoring helped identify and isolate a leaking cooling loop while the production line remained in operation.

    1 loopisolated

  • Temperature & humidityFood & Beverage ProcessingControlled Environment Agriculture (Greenhouses)

    A cold-storage alert at two in the morning

    A cold storage operation

    A refrigeration fault was detected overnight, before product temperature was affected.

    2 a.m.alert

  • Compressed airManufacturing: Automotive, Plastics & RubberMetal Fabrication & Finishing

    Compressed air leaks in a stamping operation

    A Tier 2 automotive stamping factory

    Permanent monitoring revealed compressed air continuing to flow into an otherwise idle building overnight.

    20–30%of compressor output

  • Predictive maintenanceBulk Handling & Rail LogisticsManufacturing: Automotive, Plastics & Rubber

    Conveyor-drive bearing degradation detected six weeks before failure

    A bulk handling facility

    The bearing’s vibration signature began changing approximately six weeks before the projected failure point.

    6 weeksof warning

  • Cooling towersWaterManufacturing: Automotive, Plastics & RubberBuilding Materials, Concrete & Aggregates

    Cooling tower blowdown optimization

    A plastics manufacturing factory

    Blowdown was controlled by a timer rather than conductivity, causing usable water to be discharged unnecessarily.

    1 setpointchanged

  • Compressed airNatural gasMetal Fabrication & FinishingBuilding Materials, Concrete & Aggregates

    A furnace over-cycling, seen on the air and gas traces together

    A heat-treating operation

    Short-cycling that neither the gas bill nor the air system showed alone.

    2 utilitieson one chart

  • Energy & electricityBulk Handling & Rail Logistics

    Night setback that never happened

    A distribution warehouse

    The overnight setback had silently stopped working, and it was worth about a third of the load.

    ~35%of overnight electrical load

  • Natural gasBuilding Materials, Concrete & AggregatesManufacturing: Automotive, Plastics & Rubber

    A 1970s boiler brought onto the dashboard

    A heavy manufacturing factory

    A fifty-year-old boiler, integrated through its 4-20 mA output. Nothing was ripped out.

    4-20 mAintegration

  • Energy & electricityManufacturing: Automotive, Plastics & Rubber

    Three factories, one unit of production, one outlier

    A manufacturer with three factories

    Same product, same equipment, and one factory used about 40% more energy per unit.

    ~40%more energy per unit

  • Predictive maintenanceMunicipal & Public Utilities

    Pump cavitation caught three weeks early

    A municipal water facility

    The vibration signature changed about three weeks before anyone would have heard it.

    3 weeksof warning

  • Cooling towersEnergy & electricityFood & Beverage ProcessingControlled Environment Agriculture (Greenhouses)

    Refrigeration condenser fouling detection

    A food storage and processing site

    Head pressure rose while load remained constant, revealing condenser fouling and quantifying its energy cost.

    Head pressurevs. load

  • Silo & levelFood & Beverage ProcessingControlled Environment Agriculture (Greenhouses)

    Silo-level alert before the reorder threshold

    An ingredient handling operation

    Non-contact radar provides continuous level readings and a configurable low-level alert before inventory reaches the reorder deadline.

    0silo climbs

  • Natural gasPharmaceutical & ChemicalFood & Beverage Processing

    Steam trap failure monitoring

    A pharmaceutical manufacturing site

    A failed-open steam trap vents energy continuously and silently.

    Continuousmonitoring

  • Silo & levelPharmaceutical & ChemicalMunicipal & Public UtilitiesBulk Handling & Rail Logistics

    Tank level and inventory reconciliation

    A bulk chemical storage operation

    Measured tank level reconciled against what the paperwork said was in there.

    Continuousreconciliation

  • WaterFood & Beverage Processing

    Weekend ghost flow in an empty building

    A food processing factory

    Water still running through an empty factory all weekend, worth about a fifth of the monthly bill.

    ~20%of the monthly water bill

  • Temperature & humidityMetal Fabrication & FinishingManufacturing: Automotive, Plastics & Rubber

    Welding bay CO and CO₂ monitoring

    A metal fabrication shop

    Air quality in the welding bay, watched continuously instead of checked quarterly.

    Continuousvs. quarterly

Your factory is next.

We’ll spend an hour on your floor, review recent utility bills and recommend what is worth measuring first. If a case study resembles your situation, tell us which one and we can discuss whether a client reference is available.

19 case studies · filter by utility or sector

Book a site visitRun the numbers

or call 1-833-QUANTFY (1-833-782-6839)